Christmas 2011 move

To start 2012, we moved the boat from the shop in Newark, CA that’s been home for over a decade. Rent on the Santa Rosa, CA shop began 1/1/12, with resolutions made to get the beams built this year. At this point, the floats are complete and finish painted. The main hull is complete, with the fore-cabin and main saloon furniture mostly built. Galley, head, rear cabin, propulsion, steering, dagger, rudder, main hatches, electrical and plumbing all yet to be started.

Loaded by 9am on a Landoll tilt bed trailer

starboard float safety check at Richmond Bridge toll plaza, 8 hours after moving main hull

3 hulls safely tucked in to the new shop the next morning after moving the port float

Recent Posts

Spring in Baja, part 2

https://youtu.be/jB-hvyZtwUc?si=gFDSM6n54e10rNeM

Here’s the second installment of the May 2025 trip. A little something to watch while you wait for the New Year’s Eve ball to drop.

Peace, good people.

  1. Sailing videos from last spring 2 Replies
  2. It’s time to sail home, after six years in Mexico 8 Replies
  3. Let’s Go Sailing! Leave a reply
  4. Latest Ravenswing video now on youtube 1 Reply
  5. Six Hulls Update 1 Reply
  6. Preparing the F25C tri for paint 2 Replies
  7. A very nice Corsair F27 for sale – here’s the scoop on our first tri 3 Replies
  8. mid-project, this is the time for lots of smaller tasks… Leave a reply
  9. Building and installing carbon fiber chainplates Leave a reply