Taking flight!

Tonight it’s mostly pictures. Seems they speak for themselves. Big thanks to Rolf and Kris at Bay Marine for expert crane work. Carlos, Jim and I went on deck once they had the mast down on the ball, and we lashed the two cap shrouds and forestay in about 15 mins. Just those three lines, then they removed the crane.

We motored back to our slip where Jim and Carlos busted ass on installing mainsail battens, reefing gaskets and all new sail trim telltales. After all the rigging work, at 2pm Ravenswing could take flight again. Ahhhhhhh…..kudos to Jim for driving the boat today and keeping the mast in the sky. 100% improvement over last time :)

Jib and reacher tomorrow. Stay tuned.

Locked and Loaded

After a good home cooked dinner (second major spousal gift of the day), it was a couple hours in the garage dressing out the boom for duty tomorrow. The new outboard end sheave box, and the mast-connect toggle system came out great. Reefing the three clews will be much better this time around.

Stepping it back to the morning, Raf the trucker showed up early! Minor snafu about “no honey, when he says cash that doesn’t mean you can write a check”, and who knew you can get 2grand in Benjamins from the ATM now? The mast ended up sharing with three crew coach boats, a jet ski, a new MotoGuzzi and a small Harley. This guy takes great care of the products and his clients. What a huge relief that was.

The Bay Marine project manager forklifted us off that trailer on to mast carts and we were sent to fetch Ravenswing while they worked another rig and the dock cleared. It was about 11:30 when we actually started unpacking, cleaning and dressing out the bare mast. Jeanne brought the parts I had left on the kitchen floor, then continued on to Alameda where the Harken mast head sheaves were being erroneously delivered to the Bay Marine (Svendsens) headquarters instead of their Richmond boat yard. Thank goodness they were found same-day, and we got those three halyards in. Jim, Carlos and I finished at 4:30. And that includes numerous employees coming over to talk about what a ‘bad ass mast this is’.

For Keith and RickW, here’s the red loctite on the huge Wichard standing rigging shackle. Then lashing with 1/8″ amsteel dyneema. Look how nice the hound turned out; after I left CompEng the owner Ted made a perfect press-fit steel bushing to exact fit the shackle pin. Another element of how everything on this mast is top shelf.

Now a product plug for SailTimer. This 100% solar powered and Bluetooth wireless anemometer (wind station) creates an always-on NMEA1803 signal every second, including its own internal gps. This means the unit doesn’t care at all about mast rotation! The workmanship is fantastic – the cups look very strong, the balance is extraordinary and sensitive. I hope it works as well as it looks on the ground. For $350 it does not come with a display, but you use your phone/tablet/e-reader/chart plotter with the app of your choice. Skipping that whole rotating mast compensation issue is totally worth it.

Ok- mast and boom are ready for the 8am crane appointment. Figuring a few hours to get the main and jib back in place, we hope to sail Ravenswing tomorrow afternoon. If any locals want a maiden voyage reprisal, plan on getting to our normal Marina Bay dock by noon, and call me in advance. Otherwise, let me know when you want to go out; we’ve got a lot of pent up sailing to do before the winter rains come.

I-80 westbound

Yea, the mast is spending the night in Nevada and we’re on track for a 10am delivery in Richmond on Tuesday. The weather has been perfect for mellow fall sailing, and we just hope it stays for another couple weeks.

At the boat, the solar system charging the lithium battery bank got up to a full 14.2volts charge today, once we dialed in details like the Peukert curve, absorption voltage, and efficiency rating. The Victron BMV712 is run via a Bluetooth app, making the custom configuration very easy. The hard part is deciphering and deciding what you want with your LiFePO4 batteries. Now with full charge we’ll start using the chart plotter and radar for the first time, and if that goes well, get into testing the fridge. All of these things were installed two years ago and have sat unused!

More delay-busting: Jeanne and Leslie made octopus curtains back in the Santa Rosa shop. I finally rigged up the hold-em-up lines. that’s got to be the lightest curtain rod possible!

And even though I’ve had a year to modify the boom, of course it’s getting its final paint just a day or so before installation. Monday eve will be final details fitting, like finding a new outhaul anchor point and adjuster.

We did succeed in cross drilling the 1/2″ sheave pin and 5/8″ gooseneck-toggle pin for 1/8″ cotter pins. Various old drill bits, and a new titanium one, failed and had us worried about this tiny task. But these $3 cobalt tip ones, and the drill press set down to 250rpm, made it easy. Also helps to have finally bought real cutting oil.

Tomorrow will be a big job of organizing and orchestrating the mast stepping and re-rigging. I want a smooth Tuesday/Weds, and we’re REALLY HOPING the Harken people sent those 3 masthead sheaves out late last week via a priority service. It would suck to sit at the boat yard with the mast but not be able to step it!!! We’ll know with some Monday morning phone calls.

Whip it good

“Crack that whip. Step on a crack- break your …”. Yea, you’d get Devo stuck in your head too if you did 20 or so of these tonight.

All the halyards, new lazy jacks and reefing lines got various splices and end treatments, and are now ready for the mast next week.

The truck was loaded in Massachusetts on Monday. Things got a bit behind so our delivery has moved to next Tuesday.

Stepping the mast might also be contingent upon a couple of hardware items that haven’t shown up yet. Always something!

We accomplished all the solar wiring and the MPPT controller is in “bulk charge” mode working to bring the lithium battery bank up from its 8+ year hibernation since the cells were manufactured. As the sun was setting today, with one full day on the four 100 watt panels, the system was up from 13.15 volts to 13.40. A long way to go, but we don’t have a proper 110v charger yet so I’m thinking the solar approach is ok. these two were no help that day, except for occasional scaring away of seagulls

We’re marching through smaller jobs, getting it all ready for next Tuesday.

And if you need a friend, this guy is waiting at the candy store in Old Town Sacramento…

It’s a date

Monday Oct 22 – the mast arrives at Bay Marine in Richmond! It’s being loaded on a car/toy-hauler trailer this Friday in Massachusetts, sharing a ride with three Stillwater rowing crew coaches’ boats. We’ll need just a couple of hours to run in the halyards, attach the standing rigging and bolt on the new wireless wind direction/speed instrument, then the crane lifts it aboard. Jim is coming down from Oregon. Carlos thinks he can make it. Anyone else want to stand up the new stick and hank on those sails? The goal is to go sailing Tuesday 10/23.

I’ve got about 10 days now to get all the sailing gear details sorted. We’ll record those for you …

The old mast’s wimpy gooseneck was tossed, and you saw the massively stronger setup on the mast a few posts back. Back at home now the boom inboard end is being modified to fit. We came out of Composite Engineering with a beefy hard-anodized aluminum toggle. The boom needs internal structures to receive that.

PS – vac baggers: Comp Eng draws all their stuff down to 30inches mercury after meticulous wetout or infusion of resin. I’m not going to worry anymore about oversqueezing parts. Press it in nice and tight!

With both G10 blocks bonded and carbon-skinned, we lined up under the drill press for a 5/8″ boom articulation pin.

With everything test fit, we bought a new carbide Sawzall blade and started shaping.

Without the mast, I’m having to look back at the photos and approximate measure as to whether or not I’ve rebated away enough of the boom end for vertical and lateral swing. There’s a little more grinding to do tomorrow (curve marks in last photo). We’ll go ahead and paint it as is, and hope no further cutting is needed after it’s fit to the mast.

Gotta say, pretty darned relieved not to be driving cross country right now to fetch the big stick! Got a pro doing it.

Shiny grey

Our team back in Mass. is rocking on. Photos show they’ve final trimmed the foot, sorted out the diamonds placement and they’ve got the sail track 200+ holes drilled. Jeanne and I think the paint looks fabulous.

Bummer that this is not going to fit into the 53′ container. We missed by about 4″. So we’re scrambling on other options. Might be a road trip after all.

Any builders following this on the I-80 corridor? Maybe a drop in visit from Team Ravenswing should be arranged :)